Lana Heckendorn
Ready for next glaze
2012
The area with glaze must now be covered with wax, seen in the tub to the right. The wax is brushed on and must dry a minimum of 2 hours before the next glaze color is applied.
PREV / NEXT   7 / 18
BACK TO GLAZING PROCESS